
Female Amenities Upgrade & Mechanical Plant Room Drainage Works
Comprehensive upgrade of female amenities and associated drainage systems within a secure Defence facility.
Project Details
Defence
Defence
Project Metrics
2 months
2025
Capabilities
Project Photos
Scroll horizontally to view all images →
Scope
Comprehensive upgrade of female amenities and associated drainage systems within a secure Defence facility.
Female Amenities Works:
- Full demolition and secure storage of fixtures
 - Precision trenching for new drainage systems
 - Supply and installation of new drainage infrastructure
 - Structural reinstatement and waterproofing
 - PU waterproofing, screed, tiling, grouting, and silicon sealing
 
Mechanical Plant Room:
- Additional drainage installation
 - Concrete reinstatement works
 
Detailed Works Program
Demolition & Preparation
- Full demolition of existing female amenities infrastructure
 - Secure storage and disposal of fixtures in compliance with Defence protocols
 - Site preparation and protection of adjacent operational areas
 - Service isolation and protection during demolition works
 
Drainage Infrastructure
- Precision trenching for new drainage installation
 - Supply and installation of new drainage systems to AS3500 standards
 - Integration with existing facility drainage networks
 - Pressure testing and commissioning of new drainage systems
 
Structural & Waterproofing Works
- Structural reinstatement of demolished areas
 - PU (Polyurethane) waterproofing application to Defence specifications
 - Screed installation for proper falls and drainage integration
 - Quality control testing of waterproofing systems
 
Finishing Works
- Professional tiling installation to Defence facility standards
 - Precision grouting and silicon sealing for waterproof integrity
 - Fixture installation and final connections
 - Final inspection and quality assurance testing
 
Mechanical Plant Room Works
- Additional drainage installation in adjacent mechanical plant room
 - Concrete reinstatement and structural repairs
 - Integration with amenities drainage systems
 - Equipment protection and access maintenance
 
Challenges and Context
Delivered under strict compliance protocols in a live operational environment. Works required full compliance with AS3500 and AS3740, risk assessments, service scans, Safe Work Method Statements, licensed waste disposal, and secure site barricading to maintain safety and foot traffic flow.
Operational Environment Complexities
- Live Operational Facility: Maintaining base operations while executing comprehensive upgrades
 - Strict Compliance Protocols: Adherence to Defence facility management and security requirements
 - AS3500 & AS3740 Compliance: Full compliance with Australian plumbing and waterproofing standards
 - Safety & Traffic Management: Secure site barricading while maintaining personnel movement
 - Service Protection: Comprehensive service scans and protection protocols
 
Risk Management & Safety
- Comprehensive Risk Assessments: Detailed risk analysis for all work phases
 - Safe Work Method Statements: SWMS development and implementation for all activities
 - Licensed Waste Disposal: Compliant disposal of demolition materials and fixtures
 - Service Scanning: Thorough utility location and protection protocols
 - Secure Access Control: Maintaining Defence security protocols throughout works
 
Quality & Standards Compliance
- Full adherence to AS3500 plumbing standards
 - AS3740 waterproofing compliance verification
 - Defence facility infrastructure standards implementation
 - Continuous quality monitoring and documentation
 
Outcome
Delivered on time and with full DISP-compliant procedures. Works were executed with zero disruption to base operations. The upgraded infrastructure now meets modern Defence estate standards and supports the broader goal of asset resilience and operational readiness.
Project Achievements
- On-Time Delivery: Completed within scheduled timeframe despite complex operational constraints
 - Full DISP Compliance: Maintained Defence Industry Security Program standards throughout
 - Zero Operational Disruption: Preserved base functionality and personnel access
 - Quality Excellence: All works met or exceeded Defence estate infrastructure standards
 - Safety Performance: Zero incidents throughout project execution
 
Infrastructure Improvements
- Modern female amenities meeting current Defence facility standards
 - Enhanced drainage systems with improved reliability and capacity
 - Professional waterproofing ensuring long-term structural integrity
 - Upgraded mechanical plant room drainage for equipment protection
 
Operational Benefits
- Asset Resilience: Enhanced facility durability and reduced maintenance requirements
 - Operational Readiness: Improved facility functionality supporting base operations
 - Modern Standards: Upgraded infrastructure meeting contemporary Defence requirements
 - Future-Proofing: Installation designed for long-term operational sustainability
 
Demonstration of Capability
This project showcased Odina Industries' expertise in delivering complex facility upgrades within sensitive Defence environments while maintaining strict compliance protocols, operational continuity, and superior quality outcomes. The successful execution under live operational conditions demonstrated our commitment to Defence partnership and operational excellence.




