Holsworthy Barracks Road Remediation
Restoring critical defence infrastructure
Project Details
Defence
Defence
Project Metrics
6 months
2025
Capabilities
Project Photos
Scope
Delivery of comprehensive road and subbase remediation works across multiple secured precincts within the Holsworthy Defence Barracks. The project spanned key access routes, including:
- Tobruk Lines
 - Luscombe Airfield
 - Gate 6 of the Special Forces Training Facility (SFTF)
 
The remediation works addressed critical infrastructure needs across these strategically important areas, ensuring continued operational capability and enhanced vehicle access throughout the base.
Key Work Components:
- Complete road surface rehabilitation
 - Structural subbase reconstruction
 - Drainage system integration across all designated precincts
 
Challenges & Context
The project was undertaken within a high-security Defence environment, requiring stringent compliance with site access protocols and coordination across active military zones. Compounding challenges included complex traffic staging and adverse weather conditions, necessitating adaptive and precise planning to maintain continuity of operations.
Operating Environment Complexities
- High-Security Defence Facility: Strict access controls and security clearance requirements for all personnel and materials
 - Active Military Zones: Coordination with ongoing military operations and training exercises across multiple precincts
 - Complex Traffic Management: Maintaining access to critical facilities including Luscombe Airfield and SFTF Gate 6
 - Adverse Weather Conditions: Adaptive planning and execution to manage weather-related delays and challenges
 - Multi-Precinct Coordination: Simultaneous works across Tobruk Lines, Luscombe Airfield, and SFTF areas
 
Security & Compliance Requirements
- Stringent site access protocols and personnel clearance management
 - Coordination with Defence security personnel and operational requirements
 - Maintained operational security standards across all work areas
 
Outcome
The project was delivered with full DISP compliance, maintaining operational security and Defence standards throughout. Scope was expanded during delivery at no additional cost to the client, demonstrating Odina Industries' capacity to provide value-added solutions while maintaining schedule and quality outcomes.
Project Achievements
- Full DISP Compliance: Maintained highest security standards throughout project delivery
 - Zero Compromise on Operations: Continued base functionality across all critical areas
 - Value-Added Delivery: Scope expansion at no additional cost to client
 - Schedule Adherence: On-time completion despite complex operational constraints
 - Quality Excellence: All works met or exceeded Defence infrastructure standards
 
Operational Benefits Delivered
- Enhanced vehicle access across all remediated precincts
 - Improved operational readiness and base functionality
 - Extended infrastructure lifecycle and reduced future maintenance requirements
 - Strengthened partnership with BGIS and Defence Infrastructure Sector
 
Demonstration of Capability
This project showcased Odina Industries' unique ability to deliver complex infrastructure works within the most demanding Defence environments while providing additional value through scope expansion and maintaining unwavering commitment to security, quality, and operational continuity.